Briefing
Start with an existing PV farm, a campus, and a question.
The first commercial step is a solution briefing. Weather, generation, and soils are local — a GPS pin is requested only after NDA.
The session is in English. We request that it be scheduled during U.S. business hours.
This form is gate 1.
- Existing 100 MWdc+ PV farm
- Existing interconnection and site control
- Hyperscaler, owner-platform, or investor conversations
Same-Point, Inc.
5900 Balcones Drive, Suite 100
Austin, TX 78731
Commercial path
This form is gate 1. GPS and site files start at gate 2.
Paid work at each gate is an input to the next. The site model is credited into the twin. The twin becomes the controller at NTP.
Before NDA
01
Briefing
Organization, campus MW, cooling share, PV or acres. No coordinates.
02
NDA
Mutual NDA before any GPS pin or site file is shared.
Under NDA
03
Site model
Soils, weather, NREL System Advisor Model, thermal-electric case at the pin. First paid scope. Credited to the twin.
04
Phase 1 offer
Term sheet. Scope, price envelope, retrofit vs. new-build timeline. The site model is the design basis.
05
Digital twin and MPC
Plant model and predictive controller, built from the site model. Becomes the operating controller at NTP.
06
Contract / NTP
Enabling equipment supply and specified-plant coordination.
07
First additional IT
Phase 1 cooling in service as fail-safe. Recurring lines may start.
08
Optional later
Heat recovery, generators, compute share, SPV. Only after gate 7 is proven.