In that era, the existing grid connection is the scarce asset.
Superintelligence can make a single invention cheap. Humanoid robots can make labor cheap. Neither can make a grid connection.
1An older solar plant already has the land and the grid equipment. A new interconnection often takes five to seven years. The existing interconnection is the head start. It does not by itself authorize nighttime imports or firm compute. Those still need utility and regulatory approval.
2Humanoid robots can lower the cost of farm labor. Cheaper labor deflates the price of food, so land kept for farming earns less. That is the land a hall developer will try to take. An AI hall on farmland is a not-in-my-backyard (NIMBY) public fight over arable land use. Same·Point starts on a plant already used for power, so it does not take an acre out of crops.
3Superintelligence can design around one mechanical claim, such as a drive. A design-around does not produce a full solution that includes electrical capacity, a permit, or power every hour. Two pending U.S. applications, 282 claims as filed, seek protection of the path from the digital twin and site model through cooling-first design, EPC execution, and operations.
4Same·Point repurposes that plant. Cooling comes first, so less electricity is spent on cooling and more of the capacity can serve compute. The named case prices 99.9% firm IT, meaning uptime, at $3 million per MW-year. That figure is a planning illustration, not a contracted price. A megawatt freed from cooling is worth the firm-IT rate only if it can be sold as firm IT. Otherwise it is worth only the power bill it saves.
5Lenders pay for machines that have already run, so the first plants use proved equipment. The new cooling is shown there before later plants are financed on it.
Same footprint. Existing grid infrastructure. More firm compute.
Claim counts are as filed and may change in prosecution. These are pending applications, not issued patents.